<title> Avoiding electricity blackouts in Europe </title>
<link rel="stylesheet" type="text/css" href="../../../css/pa2.css">

</head>

<body>

<blockquote>
  <!--webbot bot="Include" U-Include="../../Docheader.htm" TAG="BODY" startspan --><strong>[Documents/Docheader.htm]</strong><!--webbot bot="Include" endspan i-checksum="64216" -->
  
  
 
    
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2"><b><font size="2">Avoiding electricity 
  blackouts in Europe</font></b></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2"><b><font size="2">Doc. 10350<br></b>
  20 October 2004</font></font></p>
  
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2"><font size="2"><b>Report<br>
  </b>Committee on 
  Economic Affairs and Development<br>
  Rapporteur: Mr Milo&#154; Melc�k, Czech Republic, Socialist Group</font></font></p>
  
  
  
  
    <p align="center"><font size="2"><b>
    For debate in the Standing Committee &#151; see Rule 15 of the Rules of Procedure</b></font></p>
  
  
  
 
  
  
 
<hr size="1">
  
  
  
 
  <font SIZE="7">
  
 
    <p style="text-align: justify; text-justify: inter-ideograph"><font size="2"><i>Summary</i></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  Europe needs an 
  efficient and reliable electricity supply system to ensure the quality of life 
  of its citizens and the competitiveness of its industry. The blackouts that 
  affected several European countries in 2003 were brief but costly disruptions. 
  They served as a wake-up call, revealing the weak links in Europe&#146;s 
  electricity supply networks and the insufficient co-ordination between 
  electricity markets at national and regional level.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  The report examines how 
  blackouts may be avoided in future. To this end, it looks at the underlying 
  reasons behind power cuts that have struck Europe, the United States and 
  Canada in recent times. It also reviews the likely effects of ongoing industry 
  deregulation on electricity systems. Although total reliability in the 
  electricity supply may be a utopian goal, many improvements are possible. 
  Efforts to stabilise electricity consumption, achieve energy savings, enhance 
  network co-ordination and upgrade production capacity are priority fields of 
  action. Better taxation, pricing and regulatory policies, speedier 
  implementation of relevant legislation and harmonisation of technical 
  standards for interconnected networks across Europe are called for.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  <b>I.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Draft 
  Resolution </b></font><b><span style="font-family: Verdana"><font size="2"><i>
  [<a href="../../AdoptedText/TA04/ERES1413.htm">Link to the adopted text</a>]</i></font></span></b></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Europe needs an 
  efficient and reliable supply of electricity for the well-being of its 
  citizens and for its economic development.&nbsp; The blackouts that struck Italy, 
  the United Kingdom, Spain,<b> </b>Denmark, Sweden and other countries in 2003 
  - and the city of Athens in the summer of 2004 - were brief but costly and 
  served to draw attention to the weak links in Europe&#146;s electricity supply 
  networks, insufficient co-ordination between national or regional electricity 
  markets and, occasionally, insufficient production capacity.&nbsp; It is important 
  to prevent any reoccurrence of such breakdowns.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The ongoing 
  reforms in Europe&#146;s electricity industry are challenging the traditional 
  organisation of the industry, by which state entities have long held primary 
  responsibility for investment and where the priority has been to ensure ample 
  spare capacity to cover needs at all times.&nbsp; The present opening of markets, 
  resulting inter alia from the completion of the European Union&#146;s Internal 
  Market, weakens the position of monopolies in electricity production and 
  supply while facilitating market entry by new participants as well as 
  cross-border exchanges.&nbsp; This welcome development will, however, at the same 
  time require a more coherent regulatory framework at national and European 
  level, not least in order to prevent undue price increases by power suppliers.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Although 
  perfect reliability in electricity supply may be impossible to reach, much 
  could be done to raise it through efforts to stabilise electricity 
  consumption, achieve energy savings,<b> </b>improve network co-ordination, 
  increase production capacity via new investment and facilitate the financing 
  of energy infrastructure, while paying due heed to the protection of the 
  environment.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; As electricity 
  can neither be efficiently stored over time nor transported over large 
  distances without substantial energy loss, strong and unpredictable 
  fluctuations in demand &#150; due, for instance, to weather conditions &#150; can cause 
  major disruptions. Measures to better monitor and predict energy demand are 
  therefore particularly needed.&nbsp; Potential energy savings that can be reached 
  without affecting living standards or output are estimated at between 15 and 
  35% in the European Union, with even higher savings possible in non-EU 
  countries in Central and Eastern Europe.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The 
  Parliamentary Assembly, as regards Council of Europe member states:</font></p>
  <blockquote>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  i.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
  recommends 
  that efforts be undertaken to improve interconnections between Council of 
  Europe member states and co-operation among operators of transmission system 
  as regards the sharing of data in real time, in order to realise the economic 
  potential of the networks involved and enhance their security;</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  ii.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
  believes 
  that a more intensive overall co-ordination of network and power generation 
  investment is needed so as to permit a more rational use of resources and 
  reduce the uncertainty surrounding long-term projects and in this context 
  welcomes the 2003 commitment to realising the Regional Electricity Market 
  (REM) for South-East Europe under the region&#146;s Stability Pact;</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  iii.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
  asks 
  Council of Europe member states to make better use of taxation, pricing and 
  regulatory policies in order to:</font></p>
  </font>
  
  
  
 
  <font SIZE="2">
  
 
  <p style="text-align: justify; text-justify: inter-ideograph; text-indent: 0cm; margin-left: 36.0pt"><font size="2">
  a.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
  promote 
  energy efficiency;</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph; text-indent: 0cm; margin-left: 36.0pt"><font size="2">
  b.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
  ensure an 
  adequate framework for maintenance of, and new investment in, electricity 
  networks and power generation capacity;</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph; text-indent: 0cm; margin-left: 36.0pt"><font size="2">
  c.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
  ensure 
  efficient reserve capacity for electricity production and supply to cover 
  peaks in demand;</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph; margin-left: 36.0pt"><font size="2">
  d.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
  remove existing 
  distortions resulting from tariff and other trade barriers;</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph; text-indent: 0cm; margin-left: 36.0pt"><font size="2">
  e.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
  encourage 
  the use of new sources of energy such as solar and wind power, as well as new 
  technologies, such as laying electricity lines underground in special 
  circumstances, especially in urban and environmentally sensitive areas or in 
  regions exposed to adverse weather conditions.</font></p>
  </blockquote>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Assembly, 
  as regards the European Union and its member states:</font></p>
  <blockquote>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  i.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; calls for the 
  speedy implementation of the relevant Directives of the European Union and 
  supports its latest proposals in this field, especially regarding energy 
  efficiency, electricity infrastructure and the security of supply;</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  ii.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
  invites 
  the European Union to review the guidelines for its trans-European energy 
  networks, so as to promote the integration into the wider European energy 
  market of the electricity systems in its ten new member states as well as in 
  those of neighbouring countries outside the Union.</font></p>
  </blockquote>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  7. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Assembly 
  fully supports the Union for the Co-ordination of Transmission of Electricity 
  (UCTE) in its efforts to harmonise technical and administrative rules for 
  interconnecting the networks of its twenty-three participating countries, on 
  the basis of existing security and reliability standards.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Finally, the 
  Assembly believes that a new European Centre for Technical Coordination of 
  European Transmission Systems and Cross-border Electricity Trading is needed 
  for the proper co-ordination of the above measures.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  <b><a name="Index"></a>II.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 
  Explanatory Memorandum<i> </i>by Mr Melc�k, Rapporteur</b></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  <b>Table of Contents:</b></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  <b><a href="#1">1. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 
  INTRODUCTION</a></b></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  <b><a href="#2">2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; WHAT WENT 
  WRONG IN EUROPE&#146;S POWER NETWORKS?</a></b></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph; text-indent: -18.0pt; margin-left: 54.0pt"><font size="2">
  <b>a.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
  Immediate 
  causes</b></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph; text-indent: -18.0pt; margin-left: 54.0pt"><font size="2">
  <b>b.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
  Background 
  problems</b></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  <b><a href="#3">3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; A 
  COMPARISON BETWEEN THE US AND EUROPEAN SYSTEMS</a></b></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  <b><a href="#4">4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; WAYS 
  FORWARD</a></b></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  <b><a href="#5">5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; CONCLUDING 
  REMARKS</a></b></font></p>
  
  
  
 
  <font SIZE="7">
  
 
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  <b><a name="1" href="#Index">1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 
  INTRODUCTION</a></b></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  1.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Power systems, 
  part of the hidden inner workings of modern society, suddenly took centre 
  stage during the late summer of 2003, due to a series of dramatic power 
  outages. These served to remind us how vulnerable to and reliant upon 
  technology we have become.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The first 
  wake-up call hit the United States and Canada on 14 August 2003, when large 
  parts of the country experienced the biggest electricity blackout recorded. In 
  what appears to have been a technical failure, three power transmission lines 
  collapsed, depriving some 50 million Americans and Canadians of electricity 
  for up to 36 hours. Fortunately, the incident was well handled, with many of 
  the post-September 11 contingency plans coming into effect.
  The cost of the blackout was nevertheless considerable. The economy of New York City was estimated to have lost $ 
  1.1 billion (&#128;900 million), or roughly $ 36 million an hour, due to the 
  closure of offices, restaurants and cinemas, overtime pays to police and other 
  city workers, the loss of perishable goods, tax revenue and transport fare 
  inflows as the subway and train systems shut down. Other cities, such as 
  Detroit, Cleveland, Boston and Toronto, faced similar costs. Many factories 
  had to send home thousands of workers and employees and it took airlines 
  several days to work through the backlog of flights.</font></p>
  </font>
  <p style="text-align: left"><font size="2">
  <img border="0" src="Pictures/edoc10350_01.jpg" WIDTH="595" HEIGHT="428"></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  3. &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; A frequent 
  reaction in Europe to these events was to assert that the problem lay with the 
  US electricity system and was highly unlikely to occur on this continent. A 
  statement by the European Commission published on 14 August stated that &#147;the 
  European electricity market is much more integrated in terms of organization, 
  regulation, market liberalization and cooperation between network operators. 
  Although the possibility of a significant power cut cannot be ruled out, the 
  European electricity market appears to be better equipped to deal with such 
  situations&#148;. This affirmation proved to be an overstatement as a series of 
  large power cuts across Europe immobilised several countries in the following 
  weeks.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; On 28 August 
  2003 London was hit by a major outage, which left about 410 000 homes and 
  businesses without electricity. Thousands of passengers were stranded during 
  the evening rush hour as 1 800 trains were halted and 60% of the underground 
  network became inoperative. Two million consumers in southern Sweden and 1.8 
  million in Copenhagen experienced a massive power cut on 23 September 2003. In 
  Italy, following several planned power pauses over the summer in order to cope 
  with record high temperatures, the worst blackout in Europe since World War II 
  occurred on 28 September - leaving 50 million people (almost the entire 
  population) without power for up to 18 hours and causing several fatalities. 
  Major incidents were also reported on the Austrian-Czech power line, in Spain 
  and in Portugal, and a critical situation of a near-blackout was recorded on 
  the power line between Hungary and Austria.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Your Rapporteur 
  therefore feels it is necessary for the Parliamentary Assembly to examine 
  reasons for the recent failures in Europe&#146;s electricity market &#150; in terms of 
  production capacity, efficiency, organization, regulation, market 
  liberalization and co-operation between network operators (Doc. 9976) &#150; and to 
  make the necessary recommendations aimed at avoiding future power supply 
  disruptions, which are so harmful to our national security, public health and 
  economies. He will look at the current situation and its short-term 
  implications for the increased stability of European power systems, on the 
  understanding that another Rapporteur, also from the Committee on Economic 
  Affairs and Development, will, in a separate report, deal with Europe&#146;s mid- 
  to long-term overall energy security (Doc. 9946).</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  <b><a name="2" href="#Index">2.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; WHAT WENT 
  WRONG IN EUROPE&#146;S POWER NETWORKS?</a></b></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2"><b>
  a.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Immediate 
  causes</b></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  6.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Though on the 
  surface of it these massive power cuts all look like isolated incidents, and 
  their concurrence a mere coincidence, deeper analysis permits some common 
  faults to be identified. There is also a general relief in agreeing that none 
  of these cuts were caused through ill-intentioned acts, as had been feared 
  initially.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  7.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Prior to 
  examining the causes, however, we should note that there are two types of 
  power outage, both of which occurred in 2003. Firstly, there is a <i>power cut</i>, 
  which results from technical failings (such as the mal-operation of 
  interconnections). Secondly, there is a <i>blackout</i>, caused by a shortage 
  of generating capacity. The recent incidents in the USA, the United Kingdom, 
  Scandinavian countries and Italy can be attributed to the first type of power 
  cut, as they all were triggered by initially minor technical incidents that 
  were subsequently mishandled and escalated into much larger events.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  8.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; In the USA, the 
  original failure is thought to have started when an electricity transmission 
  line became entangled in a tree in Ohio. This caused one cable to fail, 
  transferring its power to another, which subsequently overloaded and also 
  failed. This in turn led to the transfer of all the power from the two cables 
  to a third and so on, causing the general line overheating, sagging and, 
  finally, a failure. As the &quot;cascade&quot; gathered momentum in one area, there was 
  not enough spare capacity in the regional transmission system to absorb the 
  strain. The network quickly reached full capacity and power stations shut 
  down. Safeguards should normally be in place to keep such 'cascades' of 
  failures isolated, but they did not work.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The November 
  2003 report by the US and Canadian governments attributed the blackouts to a 
  range of causes, including sloppiness and structural faults, and claimed that 
  they could have been avoided (though once the problem escalated to a certain 
  magnitude little could be done to prevent it from escaping control). The fault 
  is largely seen as that of the Ohio-based power plant operator FirstEnergy, 
  whose Eastlake plant unexpectedly shut down, and whose alarm system should 
  have alerted employees to the transmission fault. Another contributing factor 
  was the company&#146;s failure to trim trees that short-circuited three power lines 
  in Ohio. The company violated four specific voluntary standards set by the 
  NERC (North American Electric Reliability Council), whilst another grid 
  operator, Midwest, was found to have violated two industry standards. 
  Communication was also a problem (as Midwest lacked up-to-date information on 
  what was happening with FirstEnergy&#146;s power lines) slowing attempts to stop 
  the power failure from spreading.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  10.&nbsp;&nbsp;&nbsp;&nbsp; A subsequent 
  probe into previous major North American power outages found that the causes 
  of the August 2003 blackout were strikingly similar to those of earlier 
  outages. The key findings pointed to inadequate understanding of the system or 
  arising crisis situations, insufficient tree trimming and violations of the 
  voluntary reliability standards administered by the NERC. Recommendations were 
  to reinforce mandatory electricity reliability standards and government 
  oversight in both the US and Canada; to strengthen the institutional framework 
  of the NERC; to address deficiencies identified by First Energy and other 
  reliability bodies; to improve the funding, training and certification 
  requirements for operators, reliability co-ordinators and operator support 
  staff; and to upgrade the physical and cyber security of the network.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  11.&nbsp;&nbsp;&nbsp;&nbsp; The default of 
  the British electricity network in London was traced to a badly-installed fuse 
  at a power station, though some experts claim that a backlog of poor 
  maintenance was also behind the fault. Scandinavian electricity officials said 
  the power cuts started when a main transmission line connecting Sweden and 
  Denmark was affected probably by a storm which swept through the area, 
  bringing down trees.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  12.&nbsp;&nbsp;&nbsp;&nbsp; The Italian 
  failure in September proves a similar story to that of the US, with an 
  initial, regular incident of a falling tree escalating due to communication 
  problems between Transmission System Operators (TSOs). As with the US system, 
  safety requirements were in place in Europe to ensure that one isolated 
  incident should not bring down the whole system (the so called N-1 rule), but 
  it did not prove wholly successful. Storms over the Alps knocked out a 
  transmission line carrying power from Switzerland to Italy. Power was 
  transferred to a second line, which was able to cope with the extra overload 
  for 15 minutes. The Swiss operator Etrans called its Italian counterpart (GRTN) 
  10 minutes after the original incident, requesting a reduction in Italian 
  imports. This was achieved 10 minutes later, but beyond the stress point for 
  the second, now overloaded, line. This then overheated, sagged and brought 
  down a second tree, causing power to surge into the rest of the transmission 
  system. This then became unstable, leading to the breakdown of several Italian 
  generation plants and the eventual blackout of the entire country. The 
  official report of UCTE (Union for the Coordination of Transmission of 
  Electricity) blamed Swiss authorities for not reacting quickly enough as the 
  crisis unfolded, and criticized information issued by Etrans as lacking a 
  sense of urgency, so that the Italian operators failed to make a drastic 
  enough response.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  13.&nbsp;&nbsp;&nbsp;&nbsp; The second type 
  of failure, or <i>blackout</i>, is caused by an excess surge in demand. This 
  was the case with the Italian outages in the summer of 2003, and was at the 
  root of the much publicized crisis in the Californian electricity industry 
  during 2001. These blackouts are planned &#145;load shedding&#146; operations with 
  supply rationed to cope with a lack of electricity generation. Both California 
  and Italy are not able to meet their own electricity demand and rely heavily 
  on imports, obtained via interconnections with neighbouring areas.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  14.&nbsp;&nbsp;&nbsp;&nbsp; Italy&#146;s problems 
  started 15 years ago when the decision was taken to rely on imports after 
  decommissioning the country&#146;s nuclear power plants without replacing them with 
  new generating capacity (this was due to a strong environmental lobby 
  objecting to the building of power plants along the coastline that attracts 
  many tourists). Italy imports 17% of its electricity, compared with an average 
  of 2% across the rest of the European Union. This is an inherently more risky 
  strategy than relying on domestic generation. During the summer the country 
  experienced a further rise in demand for power, caused by record high 
  temperatures which sent air-conditioning usage into overdrive, and also had 
  the effect of making power plants less efficient due to the high temperature 
  of the water to be cooled. 5% rolling blackouts were consequently imposed. The 
  California crisis came from a drought in the Pacific Northwest which reduced 
  the imported hydroelectric supplies on which the state depends. (<i>More 
  details on power generation issues will be included in Mr Berceanu&#146;s report on 
  Europe&#146;s long- term energy needs)</i></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  <b>b.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Background 
  problems</b></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  15.&nbsp;&nbsp;&nbsp;&nbsp; Technical 
  failures and a surge in demand coupled with a shortage of supply may be the 
  simple explanations behind this series of power outages. However, longer term 
  trends within the European electricity industry also need to be examined. We 
  shall start with the implications of<b> </b>industry deregulation<a href="#_ftn1" name="_ftnref1" title style="color: blue; text-decoration: underline; text-underline: single"><b><sup>[1]</sup></b></a>.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  16.&nbsp;&nbsp;&nbsp;&nbsp; <i>
  Deregulation</i> 
  of the electricity system started in the US, ushering in market forces and 
  many small companies into a sector that used to be dominated by a few big 
  national corporations. Increased competition amongst <i>power suppliers</i> 
  has cut profit margins, leaving firms with less cash to invest in maintenance 
  and upgrades and making them reluctant to make new investments (we should also 
  recall the Enron affair, which among other things caused a collapse in that 
  and related companies&#146; share prices and made it harder for them to raise 
  capital). The problem is particularly acute in the 
  area of <i>power</i> <i>transmission</i>, where high-voltage capacity is 
  expected to grow by only 5% over the next decade, whilst power generation is 
  set to increase by 30% and demand by 20%. Investment is also hindered by the low 
  level of authorized transmission charges, which are sometimes insufficient to 
  cover capital costs. The dangers of such a 
  situation were amply demonstrated by the power cuts in the Northeast, where 
  there was plenty of supply from private companies at the time of the blackout 
  but not enough transmission lines to take it where it was needed. Many 
  electricity lines are running close to their limits, especially when extreme 
  weather sets in, and several high-voltage transmission lines are 
  regularly jammed up, especially in the New York area.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  17.&nbsp;&nbsp;&nbsp;&nbsp; These 
  bottlenecks make the whole system less responsive to extra demand or excess 
  capacity in different regions, making it more difficult for different areas to 
  help each other out. The government used to take responsibility for ensuring 
  that each area had enough spare capacity to act as a safeguard in times of 
  difficulty. However, since the deregulation of the industry in the 1980s, the 
  rules have been much less strict. There is no incentive to invest in 
  interconnection with other states, with the result that cooperation between 
  networks is low. An absence of the obligation to supply has led to the 
  fragmentation of the national system, as  
  transmission lines have fallen in the cracks between state and federal power. 
  Individual states cannot agree on who should pay for lines that run between 
  them, yet they are often reticent to allow the federal government to take over 
  some regulating powers.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  18.&nbsp;&nbsp;&nbsp;&nbsp; 
  The problem is 
  that the US transmission system, designed decades ago for local coordination 
  and emergency use, was not designed to handle today&#146;s large scale trading and 
  transmission of electricity across regions. Indeed 
  much of the grid network is 60 years old, with long periods of 
  under-investment by power companies. This has produced a US electricity grid 
  that is highly vulnerable and inadequate to meet growing demand fuelled by 
  such additional strains as the increased use of air conditioning and personal 
  computers. US power demand surged by 30% in the last decade, while 
  transmission capacity grew by just 15%. 
  Former energy secretary Bill Richardson even claimed that: &quot;We're a superpower 
  with a third-world grid&quot;.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  <img border="0" src="Pictures/EDOC10350_02.jpg" align="top" WIDTH="315" HEIGHT="264"><img border="0" src="Pictures/EDOC10350_03.jpg" WIDTH="315" HEIGHT="313"></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  9.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; A similar story 
  lies behind the European problems, with deregulation leading to added 
  competitive pressure on<b> </b>electricity prices, investment and 
  infrastructure in the face of surging demand. Over 
  the past decade, the cost of generating power has halved in many countries due 
  to greater efficiency, but at the same time, it has become harder to make a 
  profit from the business due to falling electricity<b> </b>prices to industry 
  in most EU member states. This makes firms more<b> </b>reluctant to 
  invest in the infrastructure needed to modernise power grids, and to leave 
  spare capacity sitting unprofitably in the system to cope with occasional 
  surges in demand. Meanwhile, industrial demand for electricity continues to 
  grow throughout the developed world. In addition, the heat wave in the summer 
  of 2003 in much of Europe boosted sales of household air conditioning units, 
  putting more pressure on power generating stations and on the grids that carry 
  power supplies.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  20.&nbsp;&nbsp;&nbsp;&nbsp; On top of 
  systems&#146; becoming older and less able to cope with the increased demand, <i>
  privatisation</i> has meant less coordination to spread demand and backup 
  systems more evenly.  <i>
  Electricity cannot be 
  efficiently stored<a href="#_ftn2" name="_ftnref2" title style="color: blue; text-decoration: underline; text-underline: single"><sup><![if !supportFootnotes]><b>[2]</b><![endif]></sup></a></i>, 
  so managing big fluctuations in demand or in power output, especially of 
  wind-powered plants (their power generation fluctuates depending on the 
  weather), can be difficult. To overcome this, there is a growing trend for 
  countries to join together and link their national grids into big regional 
  networks. This makes it possible for individual countries to manage peaks in 
  demand without having to carry too much surplus capacity, but it at the same 
  time makes them vulnerable to a domino effect when equipment breaks down<a href="#_ftn3" name="_ftnref3" title style="color: blue; text-decoration: underline; text-underline: single"><sup>[3]</sup></a>. 
  As in the US, the European grids were constructed for in-country &#145;mutual 
  help&#146;, on the assumption that each region was self-sufficient in supply and 
  could survive if a problem occurred elsewhere on the national network. The 
  system was, however, not designed for a balance of power, or reserve power, to 
  be bought abroad.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  
  21.&nbsp;&nbsp;&nbsp;&nbsp; 
  Within the European Union and its immediate vicinity, limited interconnections 
  divide the area into at least four distinct electricity markets: the United 
  Kingdom and Ireland; NordPool of the Scandinavian countries; the Iberian 
  Market; and Central EU<a href="#_ftn4" name="_ftnref4" title style="color: blue; text-decoration: underline; text-underline: single"><sup>[4]</sup></a>. 
  The well-interconnected &#145;central&#146; market (including France, Germany, Italy, 
  Belgium, the Netherlands and Austria) makes up two thirds of EU electricity 
  consumption and some of its links are congested during the periods of peak 
  demand. The Nordic and UK markets have limited capacity links with the central 
  market, whereas the linkage between the Iberian and Central markets is minor. 
  To improve interconnections, substantial investments are needed. In 2000, the 
  European Commission identified a number of priority links to be developed, 
  including with virtually all neighbouring countries<a href="#_ftn5" name="_ftnref5" title style="color: blue; text-decoration: underline; text-underline: single"><sup>[5]</sup></a>.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  22.&nbsp;&nbsp;&nbsp;&nbsp; 
  The European transmission systems risk becoming even more complex, and 
  potentially unstable, as the network widens. Several eastern 
  European states (e.g. Poland, Czech Republic, and Hungary) joined the western 
  European network during the 1990&#146;s, with Bulgaria and Romania set to link up 
  in the near future. There are plans to connect regions such as the Balkans<a href="#_ftn6" name="_ftnref6" title style="color: blue; text-decoration: underline; text-underline: single"><b><sup>[6]</sup></b></a>, 
  possibly the Maghreb area of North Africa, Turkey, the three Baltic republics 
  (Estonia, Latvia and Lithuania) and even some CIS (Commonwealth of Independent 
  States) countries, creating a link reaching all the way to Vladivostok (via 
  Kazakhstan, Mongolia and even China). The latter network extension would 
  really mean pushing way beyond the limits of any manageable system and could 
  lead to problems such as increased oscillation and insufficient co-ordination 
  between TSOs (Transmission System Operators). This would add instability to 
  the system rather than improving the security of supply.</font></p>
  <p align="left"><font size="2">
  <img border="0" src="Pictures/EDOC10350_04.jpg" WIDTH="347" HEIGHT="293"><br>
  Source: 
  <a href="http://www.ucte.org/" style="color: blue; text-decoration: underline; text-underline: single">
  www.ucte.org</a></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  23.&nbsp;&nbsp;&nbsp;&nbsp; If transmission 
  problems were behind the first type of power cuts discussed &#150; i.e. those which 
  took place in the US and Europe in August and September 2003 &#150; then generation 
  problems lie behind the second type outlined, that is, those in Italy and 
  California. <i>Industry privatization has so far largely failed to create an 
  environment suitable for investment in power plants<b> </b>and transmission 
  lines</i>. This is partly due to low returns and profitability, as was pointed 
  out in our description of the transmission problem. However, an unclear 
  regulatory environment has not helped, either. Coal generation is seen as 
  dirty, nuclear as unsafe; renewable energy sources are underdeveloped and 
  still marginal, while the &#145;dash for gas&#146; makes Europe potentially as 
  vulnerable to unstable outside import sources as is the case with oil. All of 
  this does not suggest a healthy environment for making the sort of long-term 
  investment decisions required for power infrastructure projects.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2"><b><a name="3" href="#Index">3.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 
  A COMPARISON BETWEEN THE US AND EUROPEAN SYSTEMS</a></b></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  24.&nbsp;&nbsp;&nbsp;&nbsp; Given similar 
  problems over the summer 2003, are there really any substantial differences 
  between the European and US electricity systems? Both, after all, seemed 
  equally vulnerable to both transmission and generation problems, to power cuts 
  caused by TSO coordination problems, and to blackouts caused by a lack of 
  supply.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  25.&nbsp;&nbsp;&nbsp;&nbsp; There are, 
  however, key differences between the two systems. First of all, in Europe the 
  roles of the different parties involved in the electricity market are clearly 
  defined. Most importantly, the network operators are separate companies, and 
  are much more independent than in the US, where private operators generate and 
  market electricity and may also own regional transmission networks. Reserve 
  capacity is lacking in some parts of the European Union (e.g. Italy and 
  Greece), but is sufficient across the EU as a whole, unlike in the USA.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  26.&nbsp;&nbsp;&nbsp;&nbsp; However, the 
  main difference between the European and US systems is in the more controlled 
  way in which Europe is going about the deregulation and privatization process. 
  In the 2003 EU Directive setting up the internal market for electricity<a href="#_ftn7" name="_ftnref7" title style="color: blue; text-decoration: underline; text-underline: single"><sup>[7]</sup></a>, 
  member states are required to designate an independent regulator responsible 
  for ensuring non-discrimination, effective competition and the efficient 
  funding of the market, as well as fixing transmission charges to ensure a 
  proper return on
  investment. The 
  regulator may also impose measures in event of a crisis. Meanwhile, in the US 
  the FERC (Federal Energy Regulatory Commission) lacks clear jurisdiction over 
  reliability issues, and the NERC (the transmission industry body) has only 
  voluntary rules which have proven largely insufficient.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  27.&nbsp;&nbsp;&nbsp;&nbsp; The European 
  Commission further pointed out in 2001 that the creation of a fully 
  functioning single market for electricity and gas would be dependent on 
  further interconnection between member states and on the better use of the 
  infrastructure through greater coordination and transparency<a href="#_ftn8" name="_ftnref8" title style="color: blue; text-decoration: underline; text-underline: single"><sup>[8]</sup></a>. 
  A stable regulatory environment supportive of investment in new infrastructure 
  is seen as a requirement for the successful functioning of the internal 
  market. A minimum target of 10% interconnection on installed generation 
  capacity has been set. As new interconnected infrastructure will only be 
  created if the investment costs can be covered by transmission charges, the 
  European Commission is studying extra sources of funding to ensure this takes 
  place (e.g. increasing funds from the trans-European network budget from 10% 
  to 20%). Operators also have a pan-European association designed to coordinate 
  the trade of electricity across borders, and to share information in order to 
  detect potential overloads in advance. In the US, there is no such 
  coordination between operators.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  28.&nbsp;&nbsp;&nbsp;&nbsp; Also unlike the 
  US, many European countries are adopting concrete and binding <i>energy 
  efficiency and saving measures </i>(a sensible policy given that reducing 
  on-peak consumption by saving energy can be 75% cheaper than buying it, and is 
  faster and easier than increasing supply). Ironically, Europeans already 
  consume far less energy per head than their American counterparts, showing how 
  much more work the US needs to do in the area of demand management in the face 
  of government estimates for power demand to increase by 22% to 2010 and 50% to 
  2025<a href="#_ftn9" name="_ftnref9" title style="color: blue; text-decoration: underline; text-underline: single"><sup>[9]</sup></a>.</font></p>
  <table class="MsoTableGrid" border="1" cellspacing="0" cellpadding="0" style="border-collapse: collapse; border: medium none; margin-left: 6.75pt; margin-right: 6.75pt">
    <tr>
      <td width="359" valign="top" style="width: 269.55pt; border: 1.5pt solid windowtext; padding-left: 5.4pt; padding-right: 5.4pt; padding-top: 0cm; padding-bottom: 0cm">
      <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
      &nbsp;</td>
      <td width="70" valign="top" style="width: 52.6pt; border-left: medium none; border-right: 1.5pt solid windowtext; border-top: 1.5pt solid windowtext; border-bottom: 1.5pt solid windowtext; padding-left: 5.4pt; padding-right: 5.4pt; padding-top: 0cm; padding-bottom: 0cm">
      <p style="text-align: justify; text-justify: inter-ideograph"><font size="2"><b>
      <font size="2">US</font></b></td>
      <td width="69" valign="top" style="width: 51.9pt; border-left: medium none; border-right: 1.5pt solid windowtext; border-top: 1.5pt solid windowtext; border-bottom: 1.5pt solid windowtext; padding-left: 5.4pt; padding-right: 5.4pt; padding-top: 0cm; padding-bottom: 0cm">
      <p style="text-align: justify; text-justify: inter-ideograph"><font size="2"><b>
      <font size="2">EU-15</font></b></td>
    </tr>
    <tr>
      <td width="359" valign="top" style="width: 269.55pt; border-left: 1.5pt solid windowtext; border-right: 1.5pt solid windowtext; border-top: medium none; border-bottom: 1.0pt solid windowtext; padding-left: 5.4pt; padding-right: 5.4pt; padding-top: 0cm; padding-bottom: 0cm">
      <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
      <font size="2">Gross Inland 
      Consumption / GDP&nbsp; </font>  <i><font size="2">(toe*/&#128;90M )</font></i></td>
      <td width="70" valign="top" style="width: 52.6pt; border-left: medium none; border-right: 1.5pt solid windowtext; border-top: medium none; border-bottom: 1.0pt solid windowtext; padding-left: 5.4pt; padding-right: 5.4pt; padding-top: 0cm; padding-bottom: 0cm">
      <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
      <font size="2">396</font></td>
      <td width="69" valign="top" style="width: 51.9pt; border-left: medium none; border-right: 1.5pt solid windowtext; border-top: medium none; border-bottom: 1.0pt solid windowtext; padding-left: 5.4pt; padding-right: 5.4pt; padding-top: 0cm; padding-bottom: 0cm">
      <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
      <font size="2">231</font></td>
    </tr>
    <tr>
      <td width="359" valign="top" style="width: 269.55pt; border-left: 1.5pt solid windowtext; border-right: 1.5pt solid windowtext; border-top: medium none; border-bottom: 1.0pt solid windowtext; padding-left: 5.4pt; padding-right: 5.4pt; padding-top: 0cm; padding-bottom: 0cm">
      <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
      <font size="2">Gross Inland 
      Consumption </font>  <i><font size="2">(toe*/inhabitant)</font></i></td>
      <td width="70" valign="top" style="width: 52.6pt; border-left: medium none; border-right: 1.5pt solid windowtext; border-top: medium none; border-bottom: 1.0pt solid windowtext; padding-left: 5.4pt; padding-right: 5.4pt; padding-top: 0cm; padding-bottom: 0cm">
      <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
      <font size="2">8.3</font></td>
      <td width="69" valign="top" style="width: 51.9pt; border-left: medium none; border-right: 1.5pt solid windowtext; border-top: medium none; border-bottom: 1.0pt solid windowtext; padding-left: 5.4pt; padding-right: 5.4pt; padding-top: 0cm; padding-bottom: 0cm">
      <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
      <font size="2">3.8</font></td>
    </tr>
    <tr>
      <td width="359" valign="top" style="width: 269.55pt; border-left: 1.5pt solid windowtext; border-right: 1.5pt solid windowtext; border-top: medium none; border-bottom: 1.0pt solid windowtext; padding-left: 5.4pt; padding-right: 5.4pt; padding-top: 0cm; padding-bottom: 0cm">
      <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
      <font size="2">Electricity 
      generated </font>  <i><font size="2">(kWh/inhabitant)</font></i></td>
      <td width="70" valign="top" style="width: 52.6pt; border-left: medium none; border-right: 1.5pt solid windowtext; border-top: medium none; border-bottom: 1.0pt solid windowtext; padding-left: 5.4pt; padding-right: 5.4pt; padding-top: 0cm; padding-bottom: 0cm">
      <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
      <font size="2">14 323</font></td>
      <td width="69" valign="top" style="width: 51.9pt; border-left: medium none; border-right: 1.5pt solid windowtext; border-top: medium none; border-bottom: 1.0pt solid windowtext; padding-left: 5.4pt; padding-right: 5.4pt; padding-top: 0cm; padding-bottom: 0cm">
      <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
      <font size="2">6 725</font></td>
    </tr>
    <tr>
      <td width="359" valign="top" style="width: 269.55pt; border-left: 1.5pt solid windowtext; border-right: 1.5pt solid windowtext; border-top: medium none; border-bottom: 1.5pt solid windowtext; padding-left: 5.4pt; padding-right: 5.4pt; padding-top: 0cm; padding-bottom: 0cm">
      <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
      <font size="2">Electricity in final 
      energy consumption</font></td>
      <td width="70" valign="top" style="width: 52.6pt; border-left: medium none; border-right: 1.5pt solid windowtext; border-top: medium none; border-bottom: 1.5pt solid windowtext; padding-left: 5.4pt; padding-right: 5.4pt; padding-top: 0cm; padding-bottom: 0cm">
      <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
      <font size="2">21.4%</font></td>
      <td width="69" valign="top" style="width: 51.9pt; border-left: medium none; border-right: 1.5pt solid windowtext; border-top: medium none; border-bottom: 1.5pt solid windowtext; padding-left: 5.4pt; padding-right: 5.4pt; padding-top: 0cm; padding-bottom: 0cm">
      <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
      <font size="2">19.4%</font></td>
    </tr>
  </table>
  <p style="text-align: left; "><font size="2">
  <i>Source: 2001 Annual 
  Energy Review (EU) (1999 figures)<br>
  * toe = tonne of oil 
  equivalent, or 10<sup>7 </sup>kilocalories, or 41.86 GJ</i></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2"><b>
  <a name="4" href="#Index">4.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 
  WAYS FORWARD</a></b></font></p>
  <p align="justify"><font size="2">29.&nbsp;&nbsp;&nbsp;&nbsp; What, then, needs to be done to 
  ensure both <i>security of supply</i> in future, rectifying the transmission 
  problems, and <i>adequate generation</i> to cope with ever increasing demand? 
  Some argue that the power cuts of 2003 represent mere teething problems in the 
  introduction of a market based system. If the free market is left to its own 
  devises, weaker players will be weeded out, allowing prices to rise and 
  profits to recover to a level which will ensure proper infrastructure 
  investment. In the UK, for example, it is estimated that the industry will 
  consolidate down to four or five key players that both generate electricity 
  and supply the regional networks. Meanwhile, wholesale electricity prices are 
  starting to rise on the expectations that weaker players will soon be forced 
  out. This rebound is seen as proof that this &quot;price-crisis&quot; is a simple case 
  of the forces of supply and demand at work.  
  Rising 
  prices also have an effect on the reserve power front, giving firms the 
  incentive to invest. Reserve capacity is therefore slowly beginning to 
  increase again.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  30.&nbsp;&nbsp;&nbsp;&nbsp; 
  Market forces certainly have ensured much needed improvements in the European 
  system, and have delivered lower prices. However, it seems that they have 
  pushed existing infrastructure to its limits, and that infrastructure 
  investment is now required to satisfy future demand. The market may indeed 
  deliver this eventually, but volatility in prices and insecurity of supply, as 
  experienced during 2003, may have to be endured in the meantime. The recent 
  power cuts demonstrated such risks, and tested the reaction of consumers, 
  businesses and politicians alike. Some government intervention seems 
  necessary.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  31.&nbsp;&nbsp;&nbsp;&nbsp; 
  The reaction to the blackouts in the US has been legislative, with the  
  <i>Energy Bill</i><b> </b>
  finally due 
  to be passed in 2004, representing the first comprehensive energy legislation 
  since 1992. This legislation, designed to upgrade the national grid system and 
  make it more reliable, will not solve all the industry&#146;s problems, but it will 
  help to remedy the causes of the August 2003 power cuts. For example the 
  voluntary industry electricity reliability rules (set after the New York power 
  cut of 1965), which were violated by operators in the Midwest, are set to 
  become compulsory. As well as streamlining the permit process for transmission 
  facilities, the Federal Regulator (FERC) will be given limited authority to 
  site these facilities in national interest electric transmission corridors if 
  states cannot or will not act. The bill removes the barrier to non-utility 
  companies buying utility firms, (through the repeal of the Public Utility 
  Holding Company Act), which should lead to much needed investment. This will 
  be promoted further through tax provisions (such as reducing the depreciable 
  life and sales tax on transmission assets). Energy efficiency is also 
  encouraged, including through tax credits for energy-efficient new homes and 
  offices. Funding and other provisions should also promote a stable and diverse 
  supply of fuels for electricity transmission (e.g. federal funding for clean 
  coal initiatives, tax incentives for decommissioning nuclear power plants, 
  improving licensing conditions for hydroelectric plants, incentives for more 
  natural gas production etc.).</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  32.&nbsp;&nbsp;&nbsp;&nbsp; What about 
  European legislation? Has the &#145;managed liberalization&#146; of the market worked? 
  Are the current EU Directives, which are to be implemented by mid-2004, 
  sufficient, or is further legislation required?</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  33.&nbsp;&nbsp;&nbsp;&nbsp; 
  One area that the recent power outages has shown to 
  require further attention is the role of the TSOs (Transmission System 
  Operators). Even before the blackout in Italy, there were well known issues 
  facing TSOs in Europe, ever since the unbundling of grid activities from the 
  production and trading of electricity (so that they no longer have direct 
  influence over the location of generation). Their responsibilities need to be 
  clarified, and their industry bodies (the UTCE and ETSO) have long been 
  calling for a regulatory framework outlining their role. A binding code at EU 
  level for TSOs on the technical performance of the grid and generation units 
  connected to it could be considered. UCTE is attempting to remedy shortcomings 
  in transmission system control on the part of individual TSOs and the lack of 
  co-ordination of commercial activities among its members in the electricity 
  market, by preparing a multilateral agreement and an operational handbook of 
  management provisions and standards for better congestion forecasting and 
  handling.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  34.&nbsp;&nbsp;&nbsp;&nbsp; 
  Measures to 
  strengthen cooperation across countries are also needed. On the one hand, some 
  countries have tried to protect their transmission systems by installing power 
  ration control mechanisms on interconnections. These, however, significantly 
  raise the price of transmission, go against the principles and rules of 
  synchronous co-operation and weaken the network capacity as a whole. On the 
  other hand, there have been calls for the European 
  Union to intervene and improve co-ordination of electricity production.
  Improved data exchange could also be achieved with 
  stronger mandatory rules. Certainly more co-ordination is required to 
  understand the dynamics of the grid, particularly now that physical 
  flows and trade flows are no longer the same (though estimates used by 
  operators to balance supply and demand still use the former for measurements 
  and estimates).</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  35.&nbsp;&nbsp;&nbsp;&nbsp; In this context, 
  the UCTE (Union for the Co-ordination of Transmission of Electricity) plays an 
  important role. Five of the ten new EU member states are already 
  interconnected and belong to this body. Studies are underway for further 
  interconnections with Turkey, the eastern Mediterranean and eastern Europe. 
  The UCTE&#146;s 2003 report on the electricity system adequacy for the 2004-2010 
  period forecasts that the electricity networks in the 23 countries it 
  presently covers<a href="#_ftn10" name="_ftnref10" title style="color: blue; text-decoration: underline; text-underline: single"><sup>[10]</sup></a> 
  will remain reliable in the near future (2004-2006) but that reserve capacity 
  will decrease markedly between 2008 and 2010 unless new investment to increase 
  power generation is undertaken soon. The reliability of the Iberian and 
  Italian power supply is expected to improve along with new investment in 
  plants, whereas Serbia and Montenegro, the &#147;former Yugoslav Republic of 
  Macedonia&#148; and Greece are advised to become better interconnected to protect 
  against looming shortages.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  36.&nbsp;&nbsp;&nbsp;&nbsp; The UCTE is also 
  doing very useful work to consolidate and strengthen existing agreements 
  between transmission system operators (TSOs). It has launched the preparations 
  of an Operational Handbook aimed at establishing binding security and 
  reliability rules for participating networks - with the European Commission, 
  European regulators, TSOs outside the UCTE area and other stakeholders also 
  participating.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  37.&nbsp;&nbsp;&nbsp;&nbsp; The European 
  Commission has already reacted to some of the failings in Europe&#146;s electricity 
  system in 2003, with a new draft directive<span class="MsoFootnoteReference"><a href="#_ftn11" name="_ftnref11" title style="color: blue; text-decoration: underline; text-underline: single"><sup>[11]</sup></a>, 
  issued in December 2003, highlighting the <i>need to promote investment</i>. 
  Member states will be required to have a clearly defined policy towards 
  supply-demand balance, allowing for targets for reserve capacity to be set. 
  Defined standards will have to be met regarding the security of transmission 
  and distribution networks, and each TSO will have to submit a multi-annual 
  investment statement to its national regulator, with a summary of these 
  investment programmes being submitted to the Commission that is to coordinate 
  a trans-European investment priority list. Regulators will also be able to 
  intervene in order to accelerate the completion of projects. According to the 
  European Commissioner responsible for energy, Ms Loyola de Palacio, the 
  concrete measures on upgrades to some of the key interconnections between EU 
  member states will improve both the competitive framework and security of 
  supply. The current situation, whereby the necessary investment is held up in 
  long disputes on planning issues, cannot be allowed to continue.</span></font></p>
  <span class="MsoFootnoteReference">
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  38.&nbsp;&nbsp;&nbsp;&nbsp; 
  However, too much legislation also holds its risks. For example, the EU 
  proposal that countries must have 10% connectivity has been heavily 
  criticized, notably by the UK which operates with only 2% interconnectivity 
  and does not have a system which is synchronous with the rest of Europe. The 
  Directive in question, it is argued, would be expensive to implement and 
  increase, rather than reduce, instability. Arguably, the current legislation 
  in Europe gives regulators, authorities and governments a great deal of power 
  to intervene in order to stabilize the market. The focus should be on 
  implementing outstanding EU directives, rather than adding further to 
  regulatory uncertainty which hampers the investment environment.  
  Creating a more positive 
  business environment to allow investment to take place should a priority.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  39.&nbsp;&nbsp;&nbsp;&nbsp; Market and 
  legislative responses largely address the problems associated with 
  transmission and are directed towards ensuring the <i>security of supply</i>. 
  However, the longer term issue facing Europe&#146;s energy sector is to identify 
  affordable, safe and environmentally sound primary sources of energy to ensure 
  sufficient generating capacity. Improving transmission is not a solution in 
  itself, not least since a  10-15% import capacity 
  will be unable to make up for a lack of or mislocation of generation. The EU&#146;s 
  current plans for increasing transmission do not necessarily rhyme with basic 
  energy efficiency rules, as it is cheaper to transport oil, coal and gas than 
  to transmit electricity <i>over long distances</i> (even if the original 
  source of production is less expensive than potential local supplies). 
  Compensating for any sub-efficient deployment of power plants vis-�-vis the 
  grid could in the end be a waste of money and not technically efficient (for 
  instance as oscillation increases). Authorities in the EU seem to view 
  electricity in the same way as other internal markets, with five or six big 
  players dominating national markets and competing over infrastructure 
  connections and imports. This may work for beer, paper and easily transported 
  products, but not necessarily for electricity.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  40.&nbsp;&nbsp;&nbsp;&nbsp; Attention must 
  therefore be paid to generating electricity in the &#145;correct place&#146; &#150; i.e. 
  geographically close to demand. What is also important is to guarantee <i>
  adequate generation</i> to prevent future blackouts, ensuring that either 
  sufficient spare capacity for power generation exists or more stringent 
  savings measures are introduced. The question facing Europe over the long term 
  is how to generate this needed increase. Discussions range from increasing gas 
  usage; improving the efficiency of existing energy sources such as coal; 
  revitalizing nuclear energy; or promoting renewable sources. A clear, 
  multinational response to this question will become more urgent as existing 
  infrastructure reaches the end of its life over the next decade.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  41.&nbsp;&nbsp;&nbsp;&nbsp; Yet it will be 
  extremely difficult to generate enough and reliable energy supply in whatever 
  form if consumption patterns remain on their current growth path. Making the 
  &#145;green agenda&#146; have a genuine impact on the everyday life of each European 
  citizen by <i>optimising energy consumption</i> must therefore be the ultimate 
  solution. Luckily, this is recognized by the European Commission in its latest 
  draft directive<a href="#_ftn12" name="_ftnref12" title style="color: blue; text-decoration: underline; text-underline: single"><sup>[12]</sup></a>, 
  which proposes that EU member states reduce energy consumption by 1% each year 
  through boosting energy efficiency (leading to around 6% annual energy savings 
  in 2012). 
Potential 
  energy savings that can be reached without affecting living standards or 
  output are estimated at between 15 and 35% in the European Union, with even 
  higher savings possible in non-EU countries in central and eastern Europe.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2"><b>
  <a name="5" href="#Index">5.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; CONCLUDING 
  REMARKS</a></b></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  42.&nbsp;&nbsp;&nbsp;&nbsp; In conclusion, 
  the series of power cuts in 2003 should be taken as a wake up call, reminding 
  us of the vulnerability of our European power systems, and the potential 
  devastating effects of any total blackout. Europeans should consider 
  themselves lucky that the integrated system did not fail completely in summer 
  2003 and consider this luck as an admonition to tackle existing problems as 
  outlined in this report. The risk of further cuts can be reduced if the new 
  challenges posed by liberalization are timely and properly addressed. A 
  combination of improvements in the transmission network, generation capacity, 
  demand management and investment allocation are all required to ensure true 
  security of power supplies in future. Adequate investment and regulation in 
  electricity market are essential to a smooth functioning of modern economies.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  43.&nbsp;&nbsp;&nbsp;&nbsp; The Rapporteur 
  acknowledges that strategic decisions of many European countries to open up 
  their energy markets to foreign participation have far-reaching implications. 
  If the ultimate goal is to widen consumer choices and enhance competition, the 
  transitional phase will test network co-ordination capacities which, as we 
  have seen, were strained to the limit and failed on a number of occasions last 
  year. The coming together of western and central European electricity networks 
  following EU enlargement will represent another challenge. In a departure from 
  the traditional approach to regulation - in which comfortable investment 
  levels were maintained to ensure plentiful supply of power at all times - 
  players in a liberalised market will be more attentive to cost/return 
  indicators and hence will tend to create a leaner, but, we hope, still 
  reliable system.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  44.&nbsp;&nbsp;&nbsp;&nbsp; It is in 
  conclusion important to stress the following needs:</font></p>
  <blockquote>
  <p>i.&nbsp;&nbsp;&nbsp; The speedy implementation of current EU directives, as well as support for the 
  EU&#146;s latest legislative proposals, and a drive towards a fully open but properly 
  regulated<b> </b>market.</p>
  <p>ii.&nbsp;&nbsp;&nbsp; Continued 
  investigation into the role of Transmission Systems Operators, with a view to 
  improving real-time<b> </b>data sharing and co-ordination.</p>
  <p>iii.&nbsp;&nbsp;&nbsp; The 
  efficient co-ordination of system operation through an independent and 
  suitably located body with long-term experience in this field should be 
  considered. Locating the European<b> </b>Centre for Technical Co-ordination of 
  European Transmission Systems and Cross-Border Trade in Prague is one option, 
  due to its solid experience in co-ordinating the former synchronously operated 
  &#147;MIR&#148; system that used to group Czechoslovakia, the German Democratic 
  Republic, Poland, Hungary, Romania, Bulgaria and the USSR.</p>
  <p>iv.&nbsp;&nbsp;&nbsp; The 
  promotion of transmission system and generation investment, though a stable 
  regulatory environment and fiscal incentives.</p>
  <p>v.&nbsp;&nbsp;&nbsp; Continued 
  efforts to manage electricity demand, to eliminate price distortions and to 
  promote energy efficiency programmes.</p>
  <p>vi.&nbsp;&nbsp;&nbsp; The 
  diligent application of existing security and reliability standards by 
  national transmission system operators and a further harmonisation of 
  technical and administrative rules for interconnectors as proposed by the 
  Union for the Co-ordination of Transmission of Electricity.</p>
  <p>vii.&nbsp;&nbsp;&nbsp; Further 
  revision of the EU guidelines for the Trans-European Energy Networks in order 
  to better integrate the new member states and neighbouring countries into the 
  wider energy market.</p>
  </blockquote>
  <hr noshade color="#000000" size="1" width="50%">
  <p style="text-align: justify; text-justify: inter-ideograph"><i>
Reporting 
  committee</i>: 
  Committee on Economic Affairs and Development.</p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">
  <i>
  Reference to committee</i>: 
  <a href="../doc03/EDOC9976.htm">Doc.&nbsp;9976</a> and Ref. No. 2901 of 25.11.2003.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2">Draft Resolution 
  adopted 
  by the Committee on 14 September 2004</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph; "><font size="2">
  <i>Members 
  of the Committee</i>:
  <b>Kirilov </b>(Chairman),<b> </b>Burbiene,<b> </b>Pericleous Papadopoulos, 
  Figel (Vice-Chairpersons), A�ikg�z, Adam, Anacoreta Correia, Andov,<b> </b>
  Assis Miranda, Ates, van Baalen, <b>Berceanu</b>, Bilalov, Blanco Garcia, 
  Braun,<b> </b>Brunhart,<b> Budin, </b>�avusoglu,<b> </b>Cosarciuc, Cosido 
  Gutierrez, Crema (Alternate:<b> Rigoni</b>), Djupedal, Gasoliba i B�hm 
  (Alternate: <b>Puig Cordon</b>), <b>Griffiths</b>,<b> </b>Grignon, <b>
  Gunnarsson,</b> Gusenbauer, Hakl, Haupert, H�gmark, <b>Jonas</b>, Kacin, 
  Kalanovic, Karapetyan,<b> </b>Klympush,<b> Korobeynikov, </b>Kraus, 
  Kristovskis, <b>Lachnit, </b>Le Guen (Alternate: <b>Hunault</b>),<b> </b>
  Leibrecht, Makhachev, Masseret,<b> Melc�k, </b>Mikkelsen, Milicevic, <b>Mimica,
  </b>Nikolopoulos,<b> �hman, </b>O&#146;Keeffe, Opmann, Pintat Rossell, <b>Podgorski,
  </b>Popa, Pullicino Orlando,<b> Ramoudt, </b>Ramponi, Rattini, Reimann 
  (Alternate: <b>Randegger</b>), Rivolta,<b> </b>Russell-Johnston (Alternate: <b>
  Banks</b>), Rybak,<b> Sasi, Schreiner, </b>Severin, Seyidov, Slutsky, Smith, 
  Sofiyeva,<b> </b>Stefanov,<b> </b>Tepshi, Timmermans (Alternate: <b>Kox</b>), 
  Todorovic D.,<b> </b>Vadai, Versnick,<b> </b>Vrettos,<b> Walter, </b>
  Wielowieyski,<b> Wikinski,</b> <b>Zapfl-Helbling, Zhevago</b>.</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2"><i>
N.B. The 
  names of the members who took part in the meeting appear in bold.</i></font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2"><i>
Head of 
  Secretariat</i>: 
  Mr Torbi�rn</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2"><i>
Secretary 
  to the committee:</i> 
  Mr Bertozzi</font></p>
  <p style="text-align: justify; text-justify: inter-ideograph"><font size="2"><i>

  Co-Secretaries to the committee</i>: 
  Ms Ramanauskaite; Ms Kopa�i-Di Michele</font></p>
  <hr noshade color="#000000" size="1">
  </span></font>
  <p style="text-align: justify; text-justify: inter-ideograph">
  <a href="#_ftnref1" name="_ftn1" title style="text-underline: single">
<![if !supportFootnotes]>[1]<![endif]></a><font SIZE="2"><span class="MsoFootnoteReference"><sup>
  </sup>
  With the entry into force of the EU electricity Directives 
  (2003/54 and 2003/55) and Regulation 1228/2003, all EU member states are set 
  to complete full market opening by 2007 at the latest.<span class="MsoFootnoteReference"></p>
  </span></span></font>
  <p style="text-align: justify; text-justify: inter-ideograph">
  <a href="#_ftnref2" name="_ftn2" title style="text-underline: single">
<![if !supportFootnotes]>[2]<![endif]></a><font SIZE="2"><span class="MsoFootnoteReference"><sup> 
  &nbsp;</sup>Electricity 
  is subject to numerous physical laws. One such law, known as Kirchoff&#146;s 
  Current Law (abbreviated as KCL), states that the current flowing into a 
  junction in a circuit (or a node) must equal the current flowing out of the 
  junction and at any instant in a circuit the algebraic sums of the currents 
  entering and leaving a closed circuit are zero.<span class="MsoFootnoteReference"><span class="MsoFootnoteReference"></p>
  </span></span></span></font>
  <p style="text-align: justify; text-justify: inter-ideograph">
  <a href="#_ftnref3" name="_ftn3" title style="text-underline: single">
  <![if !supportFootnotes]>
  [3]<![endif]></a><font SIZE="2"><span class="MsoFootnoteReference"> 
  Electricity flows are to a large extent determined by network layout, line 
  dimension and the geographical location of the production and consumption 
  centres. Every major change in the layout of the network, either planned or 
  forced by failures, immediately causes flow changes throughout the whole of 
  the interconnected system. Even the generally accepted security criterion 
  &#145;N-1&#146; (the system must be operated so that any one element outage does not 
  reduce the overall production and/or consumption) does not ensure 100% 
  operational security, as it cannot be checked continuously for the whole of 
  the interconnected system and its interpretation varies from TSO to TSO due to 
  their specific appreciation of the acceptable risk level on national systems. 
  Another problem for system control is the provision for the so-called &#147;free 
  traded capacity&#148; on interconnection interfaces without knowing if it will in 
  fact be used. System overloads might thus occur. As a result, TSOs tend either 
  to decrease free trade transmission capacity or to reduce the level of 
  operational security.<span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"></p>
  </span></span></span></span></font>
  <p style="text-align: justify; text-justify: inter-ideograph">
  <a href="#_ftnref4" name="_ftn4" title style="text-underline: single">
<![if !supportFootnotes]>[4]<![endif]></a><font SIZE="2"><span class="MsoFootnoteReference"><sup>
  </sup>
  &#147;Security of Supply in Electricity Markets. Evidence and Policy 
  Issues&#148;, 2002, International Energy Agency.</p>
  </span></font>
  <p style="text-align: justify; text-justify: inter-ideograph">
  <a href="#_ftnref5" name="_ftn5" title style="text-underline: single">
<![if !supportFootnotes]>[5]<![endif]></a><font SIZE="2"><span class="MsoFootnoteReference"><sup>
  </sup>
  More information can be found in COM (2000) 2683 final and the 
  &#147;Communication from the Commission to the Council and the European Parliament 
  on European Energy Infrastructure&#148; by the EU Commission, 2001.<span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"></p>
  </span></span></span></span></span></span></font>
  <p style="text-align: justify; text-justify: inter-ideograph">
  <a href="#_ftnref6" name="_ftn6" title style="text-underline: single">
<![if !supportFootnotes]>[6]<![endif]></a><font SIZE="2"><span class="MsoFootnoteReference"> 
  Following the Athens &#147;Memorandum of understanding on the Regional Energy 
  Market in South-East Europe and its Integration into the European Community 
  Internal Energy Market&#148; of December 2003 concluded with the support of the 
  Stability Pact for South-Eastern Europe.<span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"></p>
  </span></span></span></span></span></span></span></font>
  <p style="text-align: justify; text-justify: inter-ideograph">
  <a href="#_ftnref7" name="_ftn7" title style="text-underline: single">
<![if !supportFootnotes]>[7]<![endif]></a><font SIZE="2"><span class="MsoFootnoteReference">
  
  Directive 
  2003/54/EC of the European Parliament and of the Council of 26 June 2003 
  concerning common rules for the internal market in electricity and repealing 
  Directive 96/92/EC OJ L 176, 15.7.2003. Consider also Regulation (EC) no. 
  1228/2003 on conditions for access to the network for cross-border exchanges 
  in electricity. All businesses should be able to choose electricity suppliers 
  by 2005, households by 2007.<span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"></p>
  </span></span></span></span></span></span></span></span></font>
  <p style="text-align: justify; text-justify: inter-ideograph">
  <a href="#_ftnref8" name="_ftn8" title style="text-underline: single">
<![if !supportFootnotes]>[8]<![endif]></a><font SIZE="2"><span class="MsoFootnoteReference"><sup>
  </sup>See 
  European Commission Communication on European Energy Infrastructure, 2001.<span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"><span class="MsoFootnoteReference"></p>
  </span></span></span></span></span></span></span></span></span></font>
  <p style="text-align: justify; text-justify: inter-ideograph">
  <a href="#_ftnref9" name="_ftn9" title style="text-underline: single">
<![if !supportFootnotes]>[9]<![endif]></a><font SIZE="2"><span class="MsoFootnoteReference"> 
  EU consumption is estimated by the Commission to rise 2% a year between now 
  and 2020.</p>
  </span></font>
  <p style="text-align: justify; text-justify: inter-ideograph">
  <a href="#_ftnref10" name="_ftn10" title style="text-underline: single">
<![if !supportFootnotes]>[10]<![endif]></a><font SIZE="2"><span class="MsoFootnoteReference"><sup>
  </sup>
  Austria, Belgium, Bulgaria, Bosnia and Herzegovina, Croatia, 
  the Czech Republic, Denmark, France, Serbia and Montenegro, &#147;the former 
  Yugoslav Republic of Macedonia&#148;, Germany, Greece, Hungary, Italy, Luxembourg, 
  The Netherlands, Poland, Portugal, Romania, Slovak Republic, Slovenia, Spain 
  and Switzerland.</p>
  </span></font>
  <p style="text-align: justify; text-justify: inter-ideograph">
<![if !supportFootnotes]>
  <a href="#_ftnref11" name="_ftn11" style="text-underline: single">
  [11]</a><![endif]><a href="http://www.europa.eu.int/rapid/start/cgi/guesten.ksh?p_action.gettxt=gt&amp;doc=IP/03/1694|0|RAPID&amp;lg=EN">
  </a>
  
  
  
 
  <font SIZE="2">
  
 
  <span class="MsoFootnoteReference">
  
  <a href="http://www.europa.eu.int/rapid/start/cgi/guesten.ksh?p_action.gettxt=gt&amp;doc=IP/03/1694|0|RAPID&amp;lg=EN" style="color: blue; text-decoration: underline; text-underline: single">
  
  http://www.europa.eu.int/rapid/start/cgi/guesten.ksh?p_action.gettxt=gt&amp;doc=IP/03/1694|0|RAPID&amp;lg=EN</a>;</span></p>
  </font>
  <p style="text-align: justify; text-justify: inter-ideograph">
<![if !supportFootnotes]>
  <a href="#_ftnref12" name="_ftn12" style="text-underline: single">
  [12]</a><![endif]><font SIZE="2"><span class="MsoFootnoteReference"> </span>
  <a href="http://www.europa.eu.int/rapid/start/cgi/guesten.ksh?p_action.gettxt=gt&amp;doc=IP/03/1687|0|RAPID&amp;lg=EN" style="color: blue; text-decoration: underline; text-underline: single">
  
  <span class="MsoFootnoteReference">http://www.europa.eu.int/rapid/start/cgi/guesten.ksh?p_action.gettxt=gt&amp;doc=IP/03/1687|0|RAPID&amp;lg=EN</a></p>
  
  </blockquote>