<!DOCTYPE HTML PUBLIC "-//IETF//DTD HTML//EN">
<html>

<head>

<meta name="GENERATOR" content="Microsoft FrontPage 4.0">
<title>Debate of the Assembly on the activities of the European Bank for
Reconstruction and Development in 1995 in the field of nuclear safety</title>
<!-- File .htm -->
</head>

<body bgcolor="#FFFFFF">

<p align="left"><font size="5"><strong><img src="../logotran.gif" width="311" height="162"></strong></font></p>

<hr size="1">

<blockquote>
<p align="justify" style="line-height: 150%; margin-bottom: 12"><b><font face="Verdana" size="3">Debate
of the Assembly on the activities of the European Bank for Reconstruction and Development in 1995
in the field of nuclear safety</font></b>
<p align="justify" style="line-height: 150%; margin-bottom: 12">&nbsp;<p align="left">
<b> <font face="Verdana" size="2"> Doc. 7576</font></b><p align="left">
<font face="Verdana" size="2">
7 June 1996</font><p align="left">
&nbsp;<p align="left">
<b> <font size="2" face="Verdana"> CONTRIBUTION<a href="#Footnote1" name="Footref1"><sup>[1]</sup></a></font></b>
<font size="2" face="Verdana">&nbsp;</font><p align="left">
<font size="2" face="Verdana">by Mr BIRRAUX, France, Group of the European People's Party</font>
<p align="left">
<font size="2" face="Verdana"><a href="EDOC7576COR.htm">Link to the Corrigendum</a></font>
</blockquote>
 <b> 
<hr size="1">
<blockquote>
 <p>
<font face="Verdana" size="2">
Introduction</font>
</b>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;First of all, it should be made clear that this contribution concerns the activities
of the EBRD in the field of nuclear safety not only over the past year, but since the
beginning of 1993, when the G7 asked it to set up the Nuclear Safety Account.  This
account, financed from contributions from donor countries, is used for grants to fund
safety improvement projects for nuclear plants in the central and east European countries
and the CIS<a href="#Footnote2" name="Footref2"><sup>[2]</sup></a>.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;The then President of the EBRD, Mr Jacques Attali, was pleased to be able at last
&quot;to move rapidly and effectively towards providing desperately needed hardware and
equipment to upgrade those reactors which can be repaired and ultimately to shut down
the most dangerous&quot;.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;The meeting of the Sub-Committee on Technology Policy and Energy, held in
London on 12 February 1996, at the kind invitation of the EBRD and attended by Bank
representatives, was of great help in preparing this contribution<a href="#Footnote3" name="Footref3"><sup>[3]</sup></a>.  However, it does not</font>
<p>
<font face="Verdana" size="2">
cover all the problems relating to nuclear power plants in central and eastern Europe and
the CIS, only the projects financed by the EBRD.  A more far-reaching report on nuclear
power stations is currently being prepared by the Committee.</font>
<p>
<b> <font face="Verdana" size="2"> Operation of the Nuclear Safety Account (NSA)</font></b>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;According to EBRD documents, the Bank functions as the NSA Secretariat and
provides technical, management, financial, legal and administrative services.  It reports
to donors, through the Assembly of Contributors, which exercises a general supervision
over NSA management, approves six-month programmes and decides on the funding of
individual projects.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;The EBRD prepares specific projects in close collaboration with the potential
beneficiaries, firms, bilateral agencies, the G24 Secretariat, the IAEA and other
institutions.  It submits the preliminary projects to the Assembly of Contributors for
approval.  On the basis of the mandates given by the Assembly, the EBRD negotiates
grant agreements with the beneficiary countries and seeks to find agreements on power
plant safety improvement programmes.  Once the agreement has been signed, the
authority overseeing the operation of the power plant in question is responsible for
implementing the NSA project.  To this end, it sets up a Project Management Unit which
looks after the daily implementation of the project.  This unit usually includes consultants
from western firms.  The EBRD lends its assistance to the beneficiary in setting up the
Management Unit, then monitors project implementation.  It reports regularly to the
Assembly of Contributors on the progress of projects.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;The EBRD believes close co-operation has developed between it and the G24
Secretariat, as between the EBRD and the bilateral and European Union programmes.</font>
<p>
<b> <font face="Verdana" size="2"> Estimates</font></b>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;In 1993, it was estimated that rectifying &quot;the most serious and most urgent&quot;
shortfalls required some USD&nbsp;200 million (approx ECU&nbsp;160 million<a href="#Footnote4" name="Footref4"><sup>[4]</sup></a>) per plant per year
for plants using first- generation reactors<a href="#Footnote5" name="Footref5"><sup>[5]</sup></a> and USD&nbsp;150 million (approximately ECU&nbsp;120
million) for second and third-generation reactors.  The German constructor Siemens
wanted a fund of around USD&nbsp;8 billion (approximately ECU&nbsp;6.4  billion) to be set up to
rebuild all Soviet-built reactors.  The G7 set the mark at around USD&nbsp;20 billion
(approximately ECU 16 billion) to improve the safety of power plants in Russia and
Ukraine alone.  The EBRD estimated the cost at USD&nbsp;5 billion (approximately ECU 4
billion) for the VVERs, USD&nbsp;400 million (approximately ECU&nbsp;320 million) for the RBMKs
(the most urgent improvements) and USD&nbsp;3 billion (approximately ECU&nbsp;2.4 billion) for
the plants under construction.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;In 1995, a European consortium led by ABB estimated the cost of shutting down
Chernobyl at USD&nbsp;3.7 billion (approximately ECU&nbsp;3 billion) to which must be added the
cost of constructing a gas plant.  The figures quoted by Ukrainian parliaments range from
USD&nbsp;4 to 8 billion (ECU&nbsp;3.2 to 6.4 billion).</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;As regards environment decontamination programmes and epidemiological studies,
some experts quote figures as high as ECU 80-90 billion<a href="#Footnote6" name="Footref6"><sup>[6]</sup></a>.</font>
<p>
<b> <font face="Verdana" size="2"> Financial contributions</font></b>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;What has been the result of the setting up of the Nuclear Safety Account, approved
by the EBRD Board in March 1993?  At the end of 1993, 13 countries had pledged
ECU&nbsp;104 million<a href="#Footnote7" name="Footref7"><sup>[7]</sup></a>; at the end of 1994, 14 countries, in addition to the European
Commission, had pledged a total of ECU&nbsp;154 million<a href="#Footnote8" name="Footref8"><sup>[8]</sup></a>.  Recently, the EBRD announced
that 14 countries<a href="#Footnote9" name="Footref9"><sup>[9]</sup></a> and the European Union had pledged a total of ECU&nbsp;190 million<a href="#Footnote10" name="Footref10"><sup>[10]</sup></a>.</font>
<p>
<b> <font face="Verdana" size="2"> Concrete action</font></b>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;As of November 1995, four projects had been approved and grant agreements
signed by the governments concerned, public services and the EBRD (on behalf of the
NSA).</font>
<p>
<i><font face="Verdana" size="2">1.&nbsp;&nbsp;&nbsp;&nbsp;Kozloduy nuclear power plant (Bulgaria)</font></i> 
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;An ECU&nbsp;24 million project for units 1-4 (VVER-440/230s) was signed in June 1993
and is still in progress.  It includes measures for fire-protection, in-service inspection of
critical components, control-room aids for operators, emergency feedwater system, etc. 
The project is scheduled to be completed in 1996.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;The Bulgarian government had undertaken to decommission units 1-2 and
subsequently 3-4 in the medium-term when a set of investments in the energy sector had
been completed.  These investments were primarily aimed at refurbishing units 5 and 6
(VVER-1000) and the Bulgarian thermal power stations.  Recently, however, the new
government has announced that it can no longer honour these commitments in view of the</font>
<p>
<font face="Verdana" size="2">
energy situation in the country.  International financial institutions (IFIs) and the
international community have not accepted this change in position.</font>
<p>
<i><font face="Verdana" size="2">2.&nbsp;&nbsp;&nbsp;&nbsp;Ignalina nuclear power station (Lithuania)<a href="#Footnote11" name="Footref11"><sup>[11]</sup></a></font></i>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;An ECU 33 million project relating to two RBMK reactors was signed in February
1994.  It is due to be completed in 1996 or early 1997 and includes the most urgent
technically feasible upgrades, whereas a few important safety concerns may justify a
second-phase project once the safety and operational problems have been studied in
greater depth.  The project includes the installation of new emergency reactor trip signals,
fire-protection devices, a training simulator and environmental monitoring equipment.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;The Lithuanian government has agreed not to operate the power plant beyond the
time when the pressure tubes will have to be replaced (after 15-20 years of use), and to
allow an in-depth safety analysis of the plant to be made under the supervision of a panel
of international experts.  Unit 1 will be decommissioned around summer 1998, unless it
is relicensed on the basis of this analysis by the Lithuanian Safety Authority (VATESI). 
The analysis is funded by the Nuclear Safety Account at a cost of ECU&nbsp;7.3 million and
should be completed in 1996.</font>
<p>
<i><font face="Verdana" size="2">3.&nbsp;&nbsp;&nbsp;&nbsp;Russian nuclear plants</font></i>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;On 9 June 1995, agreements were signed for the Leningrad nuclear plant, which
comprises 4 RBMKs (ECU&nbsp;30 million) and the Novovoronezh and Kola plants which
comprise 4 VVER-230s (ECU&nbsp;45 million).  The Russian nuclear safety authority will be
given ECU&nbsp;0.9 million.  The situation of all the VVER-230s (of which there are four in
Russia) and the oldest RBMKs (there are a total of 11 RBMKs in Russia) will be
systematically reviewed by the Russian authorities to assess their safety and the economic
need for their continued operation at enhanced safety levels.  Russian and western experts
are to co-operate in these assessments.</font>
<p>
<i><font face="Verdana" size="2">4.&nbsp;&nbsp;&nbsp;&nbsp;Chernobyl nuclear power plant (Ukraine)</font></i>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;Preparation of the project began in December 1994 and was part of the action plan
proposed by the Ukrainian authorities at the G7 Naples Summit (July 1994).  The main
objective of the action plan is to prepare for the decommissioning of the plant in the
context of a comprehensive energy strategy.  The activities foreseen include short-term
safety improvements for unit 3 pending closure in 2000 and preparations for the
decommissioning of units 1, 2 and 3.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;The project is to fund the equipment and labour for urgent operational
improvements, technical short-term safety improvements, decommissioning equipment,
consultancy services for project administration and technical work, and consultancy
services for public information and project explanations.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;As far as the shutdown of the plant is concerned, there appears to be something
of a battle of wits underway between Ukraine and the West.  Ukrainian officials refer to
the country's deplorable economic and financial situation; parliamentary circles emphasise</font>
<p>
<font face="Verdana" size="2">
the cost of the shutdown which Ukraine is in no position to afford.  It is estimated that
10-12% of the country's budget is spent on solving the problems caused by Chernobyl. 
Parliamentarians do not rule out a possible shutdown in the year 2010, 2007 or even as
early as 2000 if Ukraine were given financial support.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;The Ukrainian President and the Prime Minister recently restated the commitment
to shutting down the Chernobyl plant in unequivocal terms: this would take place by the
year 2000 if there were sufficient financial assistance.  For the moment, the G7 has
increased the offer to USD&nbsp;3.1 billion (approximately ECU&nbsp;2.5 billion).</font>
<p>
<b> <font face="Verdana" size="2"> Balance Sheet</font></b>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;A review of the financial estimates, the amounts available to the NSA and the
projects in progress and in preparation lead to a number of somewhat unsatisfactory
conclusions.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;By comparing the various estimates of the cost of increasing the safety of the
nuclear power plants in the countries of central and eastern Europe and the CIS together
with the contributions to the Nuclear Safety Account, we reach our first conclusion: the
ECU 190 million pledged are not enough to cover even the most urgent requirements.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;Furthermore, the cost of the projects currently in progress is as follows:</font>
<p>
<font face="Verdana" size="2">
Kozloduy nuclear plant (Bulgaria)</font><div align="right"><font face="Verdana" size="2">ECU&nbsp;24 million</font></div>
<p>
<font face="Verdana" size="2">
Ignalina nuclear plant (Lithuania)</font><div align="right"><font face="Verdana" size="2">ECU&nbsp;33 million</font></div>
<p>
<div align="right"><font face="Verdana" size="2">ECU&nbsp;7.3 million</font></div>
<p>
<font face="Verdana" size="2">
Leningrad nuclear plant (Russia)</font><div align="right"><font face="Verdana" size="2">ECU&nbsp;30 million</font></div>
<p>
<font face="Verdana" size="2">
Novovoronezh and Kola nuclear</font><p>
<font face="Verdana" size="2">
plants (Russia)</font><div align="right"><font face="Verdana" size="2">ECU&nbsp;45 million</font></div>
<p>
<div align="right"><font face="Verdana" size="2">ECU&nbsp;0.9 million</font></div>
<p>
<font face="Verdana" size="2">
TOTAL</font><div align="right"><font face="Verdana" size="2">ECU&nbsp;140.2 million</font></div>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;A second conclusion may be drawn: despite the insufficiency of contributions, the
Nuclear Safety Account still has reserves which could be used for other projects (provided
that the Chernobyl project does not take up the whole of the almost ECU&nbsp;50 million so
far unused).</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;Examination of the EBRD 1993 and 1995 reports shows that the dates specified
for the completion of projects have not been adhered to.  The Kozloduy plant project was
due to be completed by the beginning of 1996, having been put back on several occasions. 
The Ignalina project should be completed in summer 1996<a href="#Footnote12" name="Footref12"><sup>[12]</sup></a>, but the date has been put
back to &quot;1996 or early 1997&quot;<a href="#Footnote13" name="Footref13"><sup>[13]</sup></a>.  It has not been possible to give a date for completion of
the projects for the Chernobyl and Russian plants.</font>

<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;It is time to sound a note of warning because it seems the initial aims are being
forgotten.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;Following the alarm raised by the IAEA itself - and it can hardly be claimed that
this is an anti-nuclear organisation - in connection with the Kozloduy plant, the G7
meeting in Munich in 1992 highlighted the urgency of taking action to improve nuclear
safety in the East.  Some claimed a right of environmental and safety intervention and
called for a new nuclear safety Marshall plan.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;Were these good intentions for the benefit of the media alone?  Or was this political
will merely a fa�ade which rapidly crumbled when confronted by the procedural realities
of a victorious technocracy putting its talents into practice under the alarmed gaze of
those who believed they had struggled for forty years to get rid of communist
bureaucracy?</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;The IAEA itself acknowledges that contrary to what had originally been thought,
there are no signs that the old nuclear plants (VVER 440/
230s) are about to be shut down. 
Indeed, some countries are taking improvement measures to justify keeping these units
in operation.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;Solemn undertakings, duly written and signed by certain countries, do not appear
to be worth the paper they are written on.  Who does anything about it?  Who makes any
attempt to ensure that these commitments are honoured?  Life goes on as though nothing
had happened and the Assembly of the Council of Europe holds an emergency debate on
Chernobyl ... ten years after the event!</font>
<p>
<b> <font face="Verdana" size="2"> Proposals</font></b>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;After creating the Nuclear Safety Account, EBRD became the leading financial
element of a whole which includes the G7 and the G24 - as political element - and
organisations as the IAEA or the NEA of the OECD, which represent the scientifical
element. This whole, supposed to treat a matter of global importance, as nuclear safety,
must be characterised by a perfect coordination between its elements and by the
complementarity of their actions.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;Responsibility for monitoring the arrangements governing the funding of the
various EBRD projects falls at present exclusively to the Assembly of Contributors, ie
those countries which have directly contributed to the Account.  Nevertheless, it is
imperative that these funding arrangements do not become untenable with each and every
contributor adding their own criteria, thereby creating a number of obstacles defeating the
ultimate aim.  It is essential to identify a common core of principles with regard to
funding arrangements and leave a certain amount of flexibility of application to take
account of the specific nature of each situation.  For example, why should American-style
hearings be imposed on the Slovak Republic?</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;There should be at least a retrospective assessment of the action undertaken which
should be circulated to all the donor and non-donor countries concerned.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;In order to achieve the original objectives set when the Nuclear Safety Account was
established and to improve this initiative significantly, the following measures are in our
view essential:</font>
 <blockquote>

<p>
<font face="Verdana" size="2">
i.&nbsp;&nbsp;&nbsp;&nbsp;Studying the possibility of abandoning the voluntary system for contributions to
the Nuclear Safety Account and encouraging EBRD member countries (with the exception
of the countries of central and eastern Europe and the CIS) to make payments in
proportion to their GDP;</font>
<p>
<font face="Verdana" size="2">
ii.&nbsp;&nbsp;&nbsp;&nbsp;Increasing the minimum amount of contributions - at present ECU&nbsp;1.5 million -
both from EBRD members and  voluntary donor countries;</font>
<p>
<font face="Verdana" size="2">
iii.&nbsp;&nbsp;&nbsp;&nbsp;Reviewing the arrangements for providing aid to the countries of central and
eastern Europe and the CIS in order to speed up procedures and make them more
effective, if necessary by revising the current system of raising contributions;</font>
<p>
<font face="Verdana" size="2">
iv.&nbsp;&nbsp;&nbsp;&nbsp;Drawing up schedules for the honouring of commitments by beneficiary countries
and where necessary penalising failure to honour these undertakings, for example by
suspending other Bank action in other fields or making the honouring of commitments a
precondition of any new involvement by the EBRD.</font>
<p>
<font face="Verdana" size="2">
v.&nbsp;&nbsp;&nbsp;&nbsp;Encouraging the countries of central and eastern Europe and the CIS to adopt
legislation in the nuclear field adapted to the implementation of EBRD projects and
strengthening the authority of the governments concerned in respect of the arrangements
for the implementation of the Account's projects by the authorities responsible for the
operation of the power plants;</font>
<p>
<font face="Verdana" size="2">
vi.&nbsp;&nbsp;&nbsp;&nbsp;Including the field of nuclear safety in the activities of the EBRD monitored by the
Parliamentary Assembly of the Council of Europe, in its capacity as a forum for
representatives of the majority of European countries;</font>
<p>
<font face="Verdana" size="2">
vii.&nbsp;&nbsp;&nbsp;&nbsp;Setting up a system to improve the already close co-operation between the EBRD
and the Parliamentary Assembly through an enhanced flow of information on the Bank's
activities in the field of nuclear safety.</font>
  <blockquote>
    <blockquote>
      <blockquote>
        <blockquote>
          <blockquote>
<hr size="1">
          </blockquote>
        </blockquote>
      </blockquote>
    </blockquote>
  </blockquote>
 </blockquote>
<p>
<font face="Verdana" size="2">
<i>Reporting committee:</i> Committee on Economic Affairs and Development (Doc. 7564)</font>
<p>
<font face="Verdana" size="2">
<i>Contributing committee: </i>Committee on Science and Technology</font>
<p>
<font face="Verdana" size="2">
<i>Reference to committee:</i> standing mandate</font>
<p>
<font face="Verdana" size="2">
<i>Contribution</i> approved by the committee on 30 May 1996</font>
<p>
<font face="Verdana" size="2">
<i>Secretaries to the committee:</i> Mr Perin and Mr Torc�toriu</font>



<hr size="1"><i><font face="Verdana" size="2"><a href="#Footref1" name="Footnote1">[1]</a>
&nbsp;&nbsp;&nbsp;&nbsp;by the Committee on Science and Technology.</font></i>
<p><i><font face="Verdana" size="2"><a href="#Footref2" name="Footnote2">[2]</a>&nbsp;&nbsp;&nbsp;&nbsp;Commonwealth of Independent States (former Soviet Union)</font> </i>
<p><i><font face="Verdana" size="2"><a href="#Footref3" name="Footnote3">[3]</a>&nbsp;&nbsp;&nbsp;&nbsp;The subject of energy efficiency, which was also discussed in London, will be dealt
with later by the Committee.</font> </i>
<p><i><font face="Verdana" size="2"><a href="#Footref4" name="Footnote4">[4]</a>&nbsp;&nbsp;&nbsp;&nbsp;At April 1996 rates.</font> </i>
<p><font face="Verdana" size="2"><a href="#Footref5" name="Footnote5"><i>[5]</i></a></font><i><font face="Verdana" size="2">&nbsp;&nbsp;&nbsp;&nbsp;It is customary to divide Soviet-designed power plants into two categories:</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;a)&nbsp;&nbsp;&nbsp;&nbsp;RBMK reactors (Chernobyl-type)</font> <p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;b)&nbsp;&nbsp;&nbsp;&nbsp;VVER reactors.</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;VVER reactors can be further divided into three groups:</font>
<p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;i)&nbsp;&nbsp;&nbsp;&nbsp;VVER-230 (440 MW) - first generation</font><p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;ii)&nbsp;&nbsp;&nbsp;&nbsp;VVER-213 (440 MW) - second generation</font><p>
<font face="Verdana" size="2">
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;iii)&nbsp;&nbsp;&nbsp;&nbsp;VVER-320 (1000 MW) - third generation.</font></i>
<p><i><font face="Verdana" size="2"><a href="#Footref6" name="Footnote6">[6]</a>&nbsp;&nbsp;&nbsp;&nbsp;Parliamentary Assembly of the Council of Europe.  Report by Mr Bassinet on
nuclear power plants in Central and Eastern Europe (Doc. 6736 and
Recommendation 1209 (1993))</font> </i>
<p><i><font face="Verdana" size="2"><a href="#Footref7" name="Footnote7">[7]</a>&nbsp;&nbsp;&nbsp;&nbsp;EBRD: Annual report 1993.</font> </i>
<p><i><font face="Verdana" size="2"><a href="#Footref8" name="Footnote8">[8]</a>&nbsp;&nbsp;&nbsp;&nbsp;EBRD: Annual report 1994.</font> </i>
<p><i><font face="Verdana" size="2"><a href="#Footref9" name="Footnote9">[9]</a>&nbsp;&nbsp;&nbsp;&nbsp;Belgium, Canada, Denmark, Finland, France, Germany, Italy, Japan, the
Netherlands, Norway, Sweden, Switzerland, the United Kingdom and the United
States.</font> </i>
<p><i><font face="Verdana" size="2"><a href="#Footref10" name="Footnote10">[10]</a>&nbsp;&nbsp;&nbsp;&nbsp;Dr Manfred Banaschik (EBRD): &quot;The activities of the EBRD Nuclear Safety
Account&quot;, statement to the meeting of the Sub-Committee on Technology Policy
and Energy (London, 12 February 1996).</font> </i>
<p><font face="Verdana" size="2"><a href="#Footref11" name="Footnote11"><i>[ 11]</i></a><i>&nbsp;&nbsp;&nbsp;&nbsp;The Ignalina plant accounts for between 76 and 90% of Lithuania's energy
production (according to data supplied by the International Atomic Energy Agency
(IAEA) in 1995 and the EBRD in 1996, respectively).</i>
</font>
<p><i><font face="Verdana" size="2"><a href="#Footref12" name="Footnote12">[12]</a>&nbsp;&nbsp;&nbsp;&nbsp;EBRD: 1994 Annual report and statement by Mr Manfred Banaschik at the
meeting of the Sub-Committee on Technology Policy and Energy (London, 12
February 1996).</font> </i>
<p><i><font face="Verdana" size="2"><a href="#Footref13" name="Footnote13">[13]</a>&nbsp;&nbsp;&nbsp;&nbsp;Statement by Mr Manfred Banaschik at the meeting of the Sub-Committee on
Technology Policy and Energy (London, 12 February 1996).</font> </i>

<p>&nbsp;</p>
</blockquote>
<p>&nbsp;</p>

</body>
</html>